Author:
Tabyang Wisitsak,Benjaoran Vacharapoom
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference23 articles.
1. Abido, M. A., and Elazouni, A. M. (2011). “Multiobjective evolutionary finance-based scheduling: entire projects portfolio.” Journal of Computing in Civil Engineering, Vol. 25, No. 1, pp. 85–97, DOI: 10.1061/(ASCE)CP.1943-5487.0000070.
2. Afshar, A. and Fathi, H. (2009). “Fuzzy multi-objective optimization of finance-based scheduling for construction projects with uncertainties in cost.” Engineering Optimization, Vol. 41, No. 11, pp. 1063–1080, DOI: 10.1080/03052150902943004.
3. Ahuja, H. N. (1976). Construction performance control by networks, Willey, New York.
4. Ahuja, H. N. and Walsh, M. A. (1983). Successful cost engineering, Willey, New York.
5. Alghazi, A., Selim, S. Z., and Elazouni, A. (2012). “Performance of shuffled frog-leaping algorithm in finance-based scheduling.” Journal of Computing in Civil Engineering, Vol. 26, No. 3, pp. 396–408, DOI: 10.1061/(ASCE)CP.1943-5487.0000157.
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献