1. Akintoye, S. A. (1991). Construction tender price index: Modelling and forecasting trends, PhD Thesis, Department of Civil Engineering, The University of Salford.
2. Back, E. W., Boles, W. W., and Fry, G. T. (2000). “Defining triangular probability distributions from historical cost data.” Journal of Construction Engineering and Management, ASCE, Vol. 126,No. 1, pp. 29–37.
3. Barrie, D. S. and Paulson, B. C. (1992). Professional construction management, Third Edition, McGraw-Hill Book, pp. 198–205.
4. Chatfield, C. (2004). The analysis of time series: An introduction, 6th Edition, CHAMPMAN & HALL/CRC, USA.
5. Chau, K. W. (1996). “Monte carlo simulation of construction costs using subjective data: Response.” Construction Management and Economics, Vol. 15, No. 1, pp. 109–115.