1. Alarcon, L. F. and Cruz, J. C. (1997). “The impact of project planning performance on project outcomes.” 10 th World Productivity Congress, Santiago, Chile, pp. 12–15.
2. Alarcon, L. F., Diethelm, S., and Rojo, O. (2002). “Collaborative implementation of lean planning systems in Chilean construction company.” Proc. 10 th Annual Conf. of IGLC, Gramado, Brazil, retrieved at: http://iglc.net/?page_id=101 .
3. Alarcon, L. F., Diethelm, S., Rojo, O., and Calderon, R. (2005). “Assessing the impacts of implementing lean construction.” Proc. 13 th Annual Conf. of IGLC, Sydney, Australia, retrieved at: http://iglc.net/?page_id=82 .
4. Alsehaimi, A., Tzortzopoulos, P., and Koskela, L. (2009). “Last planner system: Experiences from pilot implementation in the middle east.” Proc. 17 th Annual Conf. of IGLC, Taipei, Taiwan, pp. 53–66.
5. Ballard, G. (1994). “The last planner.” Spring Conference, North California Construction Institute, Monterey, California, USA, retrieved at: http://www.leanconstruction.org/pdf/LastPlanner.pdf .