1. Iyer, K. C. and Banerjee, K. (2001). “Development of decision support system for resolution of contract disputes — A systemic approach.” Proc., Portland International Conference on Management of Engineering and Technology (PICMET 2001), 29 Jul–02 Aug 2001, Portland State University, Portland, Oregon, USA.
2. Iyer, K. C., Chaphalkar N. B., and Joshi, G. A. (2008). “Understanding time delay disputes in construction contracts.” International Journal of Project Management, Vol. 26, No. 2, pp.174–184.
3. Iyer, K. C., Kalidindi, S. N., and Ganesh, L. S. (2002). Dispute prone contract clauses — A basis for operational flexibility in contract administration, Global Journal of Flexible Systems Management.
4. Thomas, H. R. and Smith, G. (1990). “Resolving disputes over contract notice requirements.” Journal of Construction Engineering and Management, ASCE., Vol. 116, No. 4, pp. 738–755.
5. Thomas, H. R. and Smith, G. (1991). “Legal aspects of oral change orders.” Journal of Construction Engineering and Management, ASCE., Vol. 117, No. 1, pp. 148–162.