1. Bocci, E. and Canestrari, F. (2012). “Analysis of structural compatibility at interface between asphalt concrete pavements and orthotropic steel deck surfaces.” Transportation Research Record: Journal of the Transportation Research Board, No. 2293, pp. 1–7, DOI: 10.3141/2293-01.
2. Buitelaar, P., Braam, R., and Kaptijn, N. (2004). “Reinforced high performance concrete overlay system for rehabilitation and strengthening of orthotropic steel bridge decks.” Proc. Orthotropic Bridge Conference, Sacramento, USA.
3. Chen, J., Liao, M. C., and Huang, C. C. (2011). “Evaluation of guss asphalt applied to steel deck surfacing.” Proc. Transportation and Development Institute Congress, Chicago, Illinois, U.S., pp. 462–71, DOI: 10.1061/41167(398)64.
4. De Backer, Outtier, H., A., and Van Bogaert, P. (2008). “Alternatives for bridge surfacings with orthotropic plated deck: A fatigue point of view.” Foundations of Civil and Environmental Engineering, No. 11, pp. 5–16, DOI: bwmeta1.element.baztech-article-BPP1-0092-0083.
5. Deng, X. (2002). “Asphalt pavement stability at high-temperature for the Jiangyin Bridge in China.” Journal of Traffic and Transportation Engineering, Vol. 2, No. 2, pp. 1–7, DOI: 671-1637(2002)02-0001-07. (In Chinese)