1. An ZL, Ma WB, Guo XX, Zou WH, Wang Y (2017) Complete set of technologies for immediately grouting into crown void with formwork after secondary lining concrete pour for new railway tunnels. Railway Engineering 57(11):48–52 (in Chinese)
2. GB/T 50080-2016 (2016) Standard for test method of performance on ordinary fresh concrete. GB/T 50080-2016, China Architecture & Building Press, Beijing, China, 5–10
3. GB/T 50081-2019 (2019) Standard for test methods of concrete physical and mechanical properties. GB/T 50081-2019, China Architecture & Building Press, Beijing, China, 5–15
4. GB/T 50448-2008 (2008) Code for application technique of cementitious grout. GB/T 50448-2008, China Architecture & Building Press, Beijing, China, 4–5
5. Guan BS (2004) Key points of tunnel maintenance management. People’s Communications Press, Beijing, China, 22–24