1. Cleland, B. R. (2002). “TMDL Development from the “Bottom Up”–Part II: Using duration curves to connect the pieces.” In: National TMDL Science and Policy 2002–WEF Specialty Conference, Water Environment Federation, Phoenix, Arizona.
2. Cleland, B. R. (2003). “TMDL Development from the “Bottom up”-Part III: Duration Curve and Wet Weather Assessment.” National TMDL Science and Policy 2003-WEF Specialty Conference, Chicago, IL.
3. Choi, K. W. (2012). Characteristics of Seasonal Pollutant Load and Application of Load Duration Curve in Jungnang Stream, Master’s Thesis, Gangwon National University, Korea.
4. Donigian, A. S. (2000). “HSPF Training Workshop Handbook and CD. Lecture #19, Calibration and Verification Issues, Slide #L19-22.” EPA, Washington Information Center, Presented and prepared for U.S. EPA, Office of Water, Office of Science and Technology.
5. Han, S. H., Shin, H. S., and Kim, S. D. (2007). “Applicability of load duration curve to nakdong river watershed management.” Journal of Korean Society on Water Environment, Vol. 23, No. 5, pp. 620–627.