1. Alizadehsalehi S, Hadavi A, Huang JC (2020) From BIM to extended reality in AEC industry. Automation in Construction 116:103254, DOI: https://doi.org/10.1016/j.autcon.2020.103254
2. Al-Zwainy FM, Mohammed IA, Al-Shaikhli KA (2017) Diagnostic and assessment benefits and barriers of BIM in construction project management. Civil Engineering Journal 3(1):63–77. DOI: https://doi.org/10.28991/cej-2017-00000073
3. Al-Zwainy FM (2018a) A state-of-the-art survey to estimate construction costs in highway and bridge projects: Analytical diagnostic study. International Journal of Civil Engineering and Technology 9(5):795–821
4. Al-Zwainy FM (2018b) Performance assessment of BIM managers using multi-source feedback method-A pilot study. ARPN Journal of Engineering and Applied Sciences 13(22):8880–8888
5. Amed OB, Lien LC, Dolgorsuren U, Liu YN (2020) Using virtual reality and augmented reality for presale house customer change. In ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction 37:8–15. IAARC Publications