1. Arashpour, M. and Arashpour, M. (2015). “Analysis of Workflow Variability and Its Impacts on Productivity and Performance in Construction of Multistory Buildings.” Journal of Management in Engineering, Vol. 31, Issue 6, DOI: 10.1061/(ASCE)ME.1943- 5479.0000363, 04015006.
2. Borcherding, J. and Oglesby, C. (1974). “Construction productivity and job satisfaction.” Journal of Construction. Div., 100-3, pp. 413–431.
3. Chang, C. K., Hanna, A. S., Lackney, J. A., and Sullivan, K. T. (2005). “Quantifying the impact of schedule compression on construction labor productivity.” Construction Research Congress, pp. 1–10. DOI: 10.1061/40754(183)58.
4. Dai, J., Goodrum, P. M., and Maloney, W. F. (2009). “Construction craft workers’ perceptions of the factors affecting their productivity.” Journal of Construction Engineering and Management, Vol. 135, No. 3. pp. 217–226, DOI: 10.1061/(ASCE)0733-9364(2009)135:3(217).
5. El-Gohary, K. and Aziz, R. (2014). “Factors influencing construction labor productivity in egypt.” Journal of Management in Engineering, Vol. 30, No. 1, pp. 1–9.