1. Archie, G. E. (1942). “The electrical resistivity log as an aid in determining some reservoir characteristics.” Trans. Am. Inst. Min. Metall. Eng., Society of Petroleum Engineers, Vol. 146, No. 1, pp. 54–62, DOI: 10.2118/942054-G.
2. Chang, S. H., Bae, G. J., Jeon, S., Yu, Y. I., and Oh, S. J. (2006). “Risk management in a TBM Tunnel.” 13th Tunnel Committee Special Conference, KSCE, Seoul, Korea, pp. 91–114 (in Korean).
3. Cho, G. C., Choi, J. S., Lee, G. H., and Lee, J. K. (2005). “Prediction of ground-condition ahead of tunnel face using electric resistivityanalytical study.” Proc. of Int. World Tunnel Cong., AITES-ITA, Istanbul, Turkey, pp. 1187–1194.
4. Choi, S., Kim, H. S., and Kim, J. S. (2008). “IP characteristics of sand and silt for investigating the alluvium aquifer.” J. Engng. Geol., Vol. 18, No. 4, pp. 423–431 (in Korean).
5. Dickmann, T. and Sander, B. K. (1996). “Drivage-concurrent Tunnel Seismic Prediction (TSP): Results from Vereina north tunnel megaproject and Piora pilot gallery.” Geomechanik-Kolloquium, Vol. 14, No. 6, pp. 406–411.