1. Abdulsalam, K. A., Ighravwe, D. E., and Babatunde, M. O. (2018). “A fuzzy-TOPSIS approach for techno-economic viability of lighting energy efficiency measure in public building projects.” Journal of Project Management, Vol. 3, No. 4, pp. 197–206, DOI: 3.10.5267/j.jpm.2018.4.001.
2. Byun, H. S. and Lee, K. H. (2005). “A decision support system for the selection of a rapid prototyping process using the modified TOPSIS method.” Int. J. Adv. Manuf. Technol., Vol. 26, Nos. 11–12, pp. 1338–1347, DOI: 10.1007/s00170-004-2099-2.
3. Carrillo, P. and Chinowsky, P. (2006). “Exploiting knowledge management: The engineering and construction perspective.” Journal of Management in Engineering, Vol. 22, pp. 2–10, DOI: 10.1061/(ASCE)0742-597X(2006)22:1(2).
4. Chen, L. R., Liu, K. H., Lai, F. P., Chang, S. S., and Lee, K. Y. (2017). “Measuring the quality of financial electronic payment system: Combined with fuzzy AHP and fuzzy TOPSIS.” Proc. 17th International Conference on Electronic Business, ICEB, Dubai, UAE, pp. 146–160.
5. Cheng, J. C. P. and Das, M. (2014). “A BIM-based web service framework for green building energy simulation and code checking.” Journal of Information Technology in Construction, Vol. 19, No. 8, pp. 150–168.