1. Autodesk (2005). Building information modeling for sustainable design, http://static.ziftsolutions.com/files/8a7c9fef2693aa1e0126d284e85e0416/ (Accessed May 28, 2011).
2. Autodesk (2007). BIM and cost estimating, http://images.autodesk.com/adsk/files/bim_cost_estimating_jan07_1_.pdf (Accessed September 27, 2010).
3. Chen, S. S., Li, J.-W., Tangirala, V.-K., Shirole A. M., and Sweeney, T. (2006). Accelerating the design and delivery of bridges with 3D bridge information modeling: Pilot study of 3D-Centric modeling processes for integrated design and construction of highway bridges, NCHRP-IDEA Program Project Final Report, Transportation Research Board Washington, D.C., USA.
4. Dysert, L. R. (2008). “An introduction to parametric estimating.” Proc., 2008 AACE International Transactions, Toronto, Canada, EST.03.
5. Fragkakis N., Lambropoulos S., and Tsiambaos G. (2011). “A parametric model for conceptual cost estimation of concrete bridge foundations.” Journal of Infrastructure Systems, ASCE, Vol. 17, No. 2, pp. 66–75, DOI: 10.1061/(ASCE)IS.1943-555X.0000044 .