1. Abdelaziz, G., Abdelalim, A., and Fawzy, Y. (2009). “Evaluation of the short and long-term efficiencies of electro-chemical chloride extraction,” Cement and Concrete Research, Vol. 39, No. 8, pp. 727–732, DOI: 10.1016/j.cemconres.2009.05.015.
2. ACI (1988). 201, Guide to Durable Concrete, ACI Manual of Concrete Practice.
3. ASTM (2009). C876: Standard Test Method for Corrosion Potentials of Uncoated Reinforcing Steel in Concrete, ed., West Conshohocken, PA: ASTM International.
4. ASTM, C. (1997). 1152M, Standard Test Method for Acid-Soluble Chloride in Mortar and Concrete, ASTM Annual Book of ASTM Standards 4.
5. Bennet, J. and Schue, T. J. (1993). Chloride removal implementation guide.