Publisher
Springer Science and Business Media LLC
Reference75 articles.
1. Akköse M, Şimşek E (2010) Non-linear seismic response of concrete gravity dams to near-fault ground motions including dam-water-sediment-foundation interaction. Applied Mathematical Modelling 34(11):3685–3700, DOI: https://doi.org/10.1016/j.apm.2010.03.019
2. Alizadehsalehi S, Hadavi A, Huang JC (2019) BIM/MR-Lean construction project delivery management system. In: 2019 IEEE Technology and Engineering Management Conference (TEMSCON), Atlanta, GA, USA, 1–6, DOI: https://doi.org/10.1109/TEMSCON.2019.8813574
3. Al-Sudairi A, Diekmann J, Songer A, Brown H (1999) Simulation of construction processes: Traditional practices versus lean principles. Proceedings IGLC. University of California, Berkeley, CA, USA 7: 39–50
4. Alves TdCL, Milberg C, Walsh KD (2012) Exploring lean construction practice, research, and education. Engineering, Construction and Architectural Management 19(5):512–525, DOI: https://doi.org/10.1108/09699981211259595
5. Ariyanti FD, Putri AC, Ningtyas DA (2021) Implementation of lean construction and critical chain project management (CCPM) for waste management and work estimation on the Ciawi dam construction project. IOP Conference Series: Earth and Environmental Science 794(1):012074