Author:
Han Seung Heon,Park Hyung Keun,Yeom Sang Min,Chae Myung Jin,Kim Du Yon
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference41 articles.
1. Abudayyeh, O. Y. and Rasdorf, W. J. (1993). “Prototype of an integrated cost and schedule control system.” Journal of Comp. in Civil Engineering, Vol. 7, No. 2, pp. 181–198.
2. Ahuja, H. N. and Walsh, M. A. (1983). Successful methods in cost engineering, John Wiley & Sons, New York, NY.
3. Arditi, D. and Gutierrez, A. E. (1991). “Factors affecting U.S. contractors’ performance overseas.” Journal of Construction Engineering and Management, Vol. 117, No. 1, pp. 27–46.
4. Ashley, D. B. and Bonner, J. J. (1987). “Political risks in international construction.” Journal of Construction Engineering and Management, Vol. 113, No. 3, pp. 447–467.
5. Ashley, D. B. and Teicholz, P. M. (1977). “Pre-estimated cash flow analysis.” Journal of the Construction Division. Proceedings of ASCE, Vol. 103, No. CO3, pp. 369–379.
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献