1. Arn, P. M. (1987). A survey of productivity in the construction industry: Measurement and causes, Georgia Institute of Technology, Atlanta, GA.
2. Choi, Y. K. (2003). “Construction progress measurement system by tracking the work-done performance.” Korean Journal of Construction Engineering and Management, vol. 4, no. 3, pp. 137–145.
3. Clark, F. D. and Lorenzoni, A. B. (1979). Applied cost engineering, Marcel Dekker, Inc., New York, N.Y.
4. Eldin, N. N. (1989). “Measurement of work progress: Quantitative technique.” Journal of Construction Engineering and Management, ASCE, vol. 115, no. 3, pp. 462–474, DOI: 10.1061/(ASCE)0733-9364(1989)115:3(462).
5. Electronic Industries Alliance (US) (1998). Earned Value Management Systems, EIA Standard, Electronic Industries Alliance, Arlington, VA.