Author:
Ghoddousi Parviz,Ansari Ramin,Makui Ahmad
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference53 articles.
1. Ansari, R., Shakeri, E., and Raddadi, A. (2014). “Framework for aligning project management with organizational strategies.” Journal of Management in Engineering, DOI: 10.1061/(ASCE) ME.1943-5479.0000249.
2. Ashtiani, B., Jalali, G.-R., Aryanezhad, M.-B., and Makui, A. (2007). “A new approach for buffer sizing in Critical Chain scheduling.” Industrial Engineering and Engineering Management, 2007 IEEE International Conference on.
3. Bie, L., Cui, N., and Zhang, X. (2012). “Buffer sizing approach with dependence assumption between activities in critical chain scheduling.” International Journal of Production Research, Vol. 50, No. 24, pp. 7343–7356, DOI: 10.1080/00207543.2011.649096.
4. Bordoli, D. W. and Baldwin, A. N. (1998). “A methodology for assessing construction project delays.” Construction Management & Economics, Vol. 16, No. 3, pp. 327–337, DOI: 10.1080/014461998372358.
5. Braimah, N. (2013). “Understanding construction delay analysis—the role of pre-construction programming.” Journal of Management in Engineering, DOI: 10.1061/(ASCE)ME.1943-5479.0000216.
Cited by
19 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献