Author:
Bianco Lucio,Caramia Massimiliano
Publisher
Springer Science and Business Media LLC
Subject
Industrial and Manufacturing Engineering,Management Science and Operations Research
Reference11 articles.
1. Alvarez-Valdés R, Tamarit JM (1993) Project scheduling polyhedron: dimension, facets and lifting theorems. European Journal of Operational Research 67(2):204–220
2. Bianco L, Caramia M (2011) Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound 4OR. doi: 10.1007/s10288-011-0168-6
3. Blazewicz J, Lenstra JK, Rinnooy Kan AHG (1983) Scheduling subject to resource constraints: classification and complexity. Disc Appl Math 5(1):11–24
4. Kaplan LA (1988) Resource constrained project scheduling with preemption of jobs, Unpublished Ph.D Thesis, University of Michigan
5. Kelley JE (1963) The critical path method: resource planning and scheduling. In: Muth JF, Thompson GL (eds) Industrial scheduling., Prentice Hall, NJ, pp 347–365
Cited by
42 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献