Publisher
Springer Science and Business Media LLC
Subject
Industrial and Manufacturing Engineering,Management Science and Operations Research
Reference40 articles.
1. Alvarez-Valdes R, Tamarit JM (1989) Heuristic algorithms for resource-constrained project scheduling: a review and an empirical analysis. In: Słowiński R, Wȩglarz J (eds) Advances in project scheduling, Elsevier, Amsterdam, pp 113–134
2. Bartusch M, Möhring RH, Radermacher FJ (1988) Sched-uling project networks with resource constraints and time windows. Ann Oper Res 16:201–240
3. Bianco L, Caramia M (2011) A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations. Comput Oper Res 38:14–20
4. Bowerman BL, O’Connell RT (2003) Business statistics in practice. McGraw-Hill, New York
5. Brucker P, Drexl A, Möhring R, Neumann K, Pesch E (1999) Resource-constrained project scheduling: Notation, classification, models, and methods. Eur J Oper Res 112:3–41
Cited by
39 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献