1. Arvindh B, Irani SA (1994) Cell formation: The need for integrated solution of the subproblems. International Journal of Production Research 32(5):1197–1218
2. Askin RG, Lundgren NH, Ciarallo F (1996) A material flow based evaluation of layout alternatives for agile manufacturing. In (Graves RJ et. al.), Progress in material handling research, Ann Arbor, MI: Material Handling Institute, Braun-Brumfield Inc., 71–90
3. Askin RG, Zhou M (1998) Formation of independent flowline cells based on operation requirements and machine capabilities. IIE Transactions 30:319–329
4. Benjaafar S, Sheikhzadeh M (2000) Design of flexible plant layouts. IIE Transactions 32:309–322
5. Drolet JR, Moodie CL, Montreuil B (1989) An expansion of the virtual cell concept for scheduling computer integrated manufacturing systems. In Proceedings of the IFAC International Workshop on Decisional Structures in Automated Manufacturing, pp. 9–24