Author:
Koné Oumar,Artigues Christian,Lopez Pierre,Mongeau Marcel
Publisher
Springer Science and Business Media LLC
Subject
Industrial and Manufacturing Engineering,Management Science and Operations Research
Reference34 articles.
1. Agha MH, Thery R, Hetreux G, Haït A, Le Lann J-M (2010) Integrated production and utility system approach for optimizing industrial unit operations. Energy 35(2):611–627
2. Alvarez-Valdès R, Tamarit JM (1993) The project scheduling polyhedron: dimension, facets and lifting theorems. Eur J Oper Res 67(2):204–220
3. Applegate D, Cook W (1991) A computational study of job-shop scheduling. ORSA J Comput 3(2):149–156
4. Artigues C, Michelon P, Reusser S (2003) Insertion techniques for static and dynamic resource-constrained project scheduling. Eur J Oper Res 149(2):249–267
5. Artigues C, Koné O, Lopez P, Mongeau M, Néron E, Rivreau D (2008) Computational experiments. In: Artigues C, Demassey S, Néron E (eds) Resource-constrained project scheduling: Models, algorithms, extensions and applications, ISTE/Wiley, pp 98–102
Cited by
42 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献