1. Zhang, J.: The stress of the jack up method in the installation of the offshore platform. Pet. Eng. Constr. 35(1), 23–25 (2009)
2. Wei, H.: Dynamic Analysis of Multi floating Bodies in the Upper Part of the Spar Platform. Harbin University of Technology, Harbin (2012)
3. Li, X.: Study on the Response of Two Ships in the Float Over Installation of Floating Multi-Body Hydrodynamic Performance and Motion. Ocean University of China, Qingdao (2013)
4. Wang, A.M., Jiang, X., Yu, C.: Lastest progress in floatover technologies for offshore installations and decommissioning. In: Proceedings of the 20th International Offshore and Polar Engineering Conference, vol. 1, pp. 9–20. Beijing, China (2010)
5. Tahar, A., Halkyard, J., Steen, A., Finn, L.: Float over installation method-comprehensive between numerical and model test results. In: Proceedings of 25th International Conference on Offshore Mechanics and Arctic Engineering, vol. 128, 256–262. Hambug, Germany (2006)