Author:
Wu Shifeng,Song Huazhu,Li Ting,Zhong Xian
Funder
National Natural Science Fund of China
Sub research topic of a National Science and Technology Support Plan
Natural Science Foundation of Hubei Province
Publisher
Springer Science and Business Media LLC
Subject
Computer Networks and Communications,Software
Reference24 articles.
1. Li, X.: Research and application of quality management in engineering supervision. Industry C 04, 00044–00045 (2016)
2. Li, X., Xu, J., Zhang, Q.: Research on construction schedule management based on BIM technology. Procedia Eng. 174, 657–667 (2017)
3. Wang, K.C., Wang, W.C., Wang, H.H., et al.: Applying building information modeling to integrate schedule and cost for establishing construction progress curves. Autom. Constr. 72, 397–410 (2016)
4. Faghihi, V., Reinschmidt, K.F., Kang, J.H.: Construction scheduling using genetic algorithm based on building information model. Expert Syst. Appl. 41(16), 7565–7578 (2014)
5. Hardison, D., Behm, M., Hallowell, M.R., et al.: Identifying construction supervisor competencies for effective site safety. Saf. Sci. 65, 45–53 (2014)