1. Campos J, de Rus G (2009) Some stylized facts about high-speed rail: a review of HSR experiences around the world. Trans Policy 16(1):19–28. https://doi.org/10.1016/j.tranpol.2009.02.008
2. Esveld C (2001) Modern railway track. MRT-productions, Zaltbommel, ISBN 90-800324-3-3, SISO 696.3 UDC 625.1, pp 1–629
3. Zhai W, He Z, Song X (2010) Prediction of high-speed train induced ground vibration based on train-track-ground system model. Earthq Eng Eng Vib 9(4):1–10. https://doi.org/10.1007/s11803-010-0036-y
4. High Speed lines in the World – UIC Passenger Department (2020) 1–10. https://uic.org/IMG/pdf/20200227_high_speed_lines_in_the_world.pdf
5. National High-Speed Rail Corridor Project (2019) Monitoring and Evaluation of Social Safeguard (RAP & IPP Implementation) for Mumbai-Ahmedabad High Speed Rail Project (508 Km), Quarterly Progress Report July - September 2019, CRADLE, C-258, Ashok Nagar, Ranchi. https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm00009v1ylc-att/c8h0vm0000f88y1r.pdf