1. Kamon M, Inui T (2002) Geotechnical problems and solutions of controlled waste disposal sites (in Japanese). JSCE J Geotech Eng 701/III-58:1–15
2. Oki T, Torizaki K, Kita H, Yoshida M, Sakaguchi Y, Yoshino H (2003) Evaluation of impermeability performance of the vertical impermeable walls made by using steel sheet piles and steel pipe sheet piles (in Japanese). In: Proceedings of the 5th Japan National Symposium on Environmental Geotechnology. JGS, Tokyo, pp 53–58
3. Inazumi S, Kimura M, Too AJK, Kamon M (2005) Performance of H-jointed steel pipe sheet piles with H-H joints in vertical hydraulic cutoff walls. In: Proceedings of the 16th International Conference on Soil Mechanics and Geotechnical Engineering vol 4. ISSMGE, Osaka, pp 2269–2272
4. Inazumi S, Kimura M (2009) On-site verification for installation and permeability of H-jointed SPSPs with H-H joints. In: Proceedings of the 17th International Conference on Soil Mechanics and Geotechnical Engineering. vol. 3, ISSMGE, Alexandria, pp 2540–2543
5. Waterfront Vitalization and Environment Research Center (2002) Design, construction, and management manual for managed type waste reclamation (in Japanese). Waterfront Vitalization and Environment Research Center, Tokyo