1. Carey A (2017) What a waste: Victoria’s rubbish pile projected to hit 20 million tonnes a year. Fairfax Media http://www.theage.com.au/victoria/what-a-waste-victorias-rubbish-pile-projected-to-hit-20-million-tonnes-a-year-20170803-gxot6x.html. Accessed 24 Aug 2017
2. Douglas A (2014) Public environmental review response to submissions. Pheonix energy, Melbourne
3. New Energy (2014) The Pilbara Waste to Energy Project New Energy Corporation Pty. Ltd, West Perth
4. Energy New (2016) Waste to energy project East Rockingham. New Energy Corporation Pty, Ltd, West Perth
5. Weiss J (2016) Why is some plastic recycling no longer cost-effective? Blame fracking. The Dallas Morning News.
https://www.dallasnews.com/business/business/2016/07/29/recycling-plastics-longer-makes-economic-sense-blame-fracking
. Accessed 16 Aug 2014