1. Al-Ashaab, A., Shehab, E., Alam, R., Sopelana, A., Sorli, M., Flores, M., Taisch, M., Dragan Stokic, D. and James-Moore, M., (2010). The Conceptual LeanPPD Model. The 17th ISPE International Conference on Concurrent Engineering September, Cracow, Poland.
2. Atkinson, D and Al-Ashaab, A. (2008) A review and critical analysis of global New Product Introduction and Development, Int J of Product Development, vol. 6, no.2, pp. 118-141.
3. Duverlie, P. and Castelain, J. (1999), "Cost estimation during design step: parametric method versus case based reasoning method", The international journal of advanced manufacturing technology, vol. 15, no. 12, pp. 895-906.
4. Morgan, J.M. and Liker, J.K. (2006) The Toyota Product Development System, New York: Productivity Press.
5. Sobek, D. K., Ward, A. C. and Liker, J. K. (1999), "Toyota's principles of set-based concurrent engineering", Sloan management review, vol. 40, no. 2, pp. 67-84.