Abstract
AbstractTrackwork planning and scheduling are demanding because they require strategic foresight and must be completed well in advance. In Sweden, trackwork is performed by maintenance contracting companies during an operation period free from trains. In the contractors’ practice, once the maintenance plan is authorised, some unexpected events might interrupt the plan’s execution, leading to uncertainties. The purpose of this study is to identify and classify uncertainties and strategies applied to manage uncertainties in the contractors’ everyday planning and scheduling of trackwork. This work presents semi-structured interviews with foremen and planners at railway maintenance contracting companies in Sweden. The main findings show that in trackwork planning and scheduling, contractors deal with two types of uncertainties: internal and external. We categorised uncertainties and strategies to deal with uncertainties and described them on tactical and operational levels. The majority of the revealed uncertainties led to trackwork rescheduling. Furthermore, we suggest that current strategies to manage uncertainties applied at contracting companies can be improved by revising organisational design strategies for maintenance projects. This work increases the understanding and supports the management of uncertainties in trackwork planning and scheduling.
Publisher
Springer Science and Business Media LLC
Subject
Management Science and Operations Research,Mechanical Engineering,Transportation,Information Systems
Reference69 articles.
1. Braun V, Clarke V (2006) Using thematic analysis in psychology. Qual Res Psychol 3(2):77–101. https://doi.org/10.1191/1478088706qp063oa
2. Budai-Balke G (2009) Operations research models for scheduling railway infrastructure maintenance. Doctoral thesis, Erasmus University Rotterdam, Rotterdam, Netherlands
3. Bueno PM, Vilela PR, Christofoletti LM, Vieira AP (2019) Optimising railway track maintenance scheduling to minimise circulation impacts. In: JRC2019: joint rail conference, pp 1–11
4. DeJonckheere M, Vaughn LM (2019) Semistructured interviewing in primary care research: a balance of relationship and rigour. Fam Med Community Health 7(2):1–8
5. Dyrssen CE, Göransdotter H (2017) Servicefönster i järnvägsanläggningen—En studie om varför nyttjandet ser ut som det gör (Maintenance window in the railway facility—A study of why the use looks the way it does). Master thesis, Lund University, Lund, Sweden
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献