Publisher
Springer Science and Business Media LLC
Reference43 articles.
1. Muştu, S., Eren, T.: Maximum completion time under a learning effect in the permutation flowshop scheduling problem. Int. J. Ind. Eng. Theory Appl. Pract. 25, 156–174 (2018)
2. Biskup, D.: A state-of-the-art review on scheduling with learning effects. Eur. J. Oper. Res. 188, 315–329 (2008). https://doi.org/10.1016/j.ejor.2007.05.040
3. Anzanello, M.J., Fogliatto, F.S.: Learning curve models and applications: Literature review and research directions. Int. J. Ind. Ergon. 41, 573–583 (2011). https://doi.org/10.1016/j.ergon.2011.05.001
4. Azzouz, A., Ennigrou, M., Ben Said, L.: Scheduling problems under learning effects: classification and cartography. Int. J. Prod. Res. 56, 1642–1661 (2018). https://doi.org/10.1080/00207543.2017.1355576
5. Badiru, A.B.: Computational survey of univariate and multivariate learning curve models. IEEE Trans. Eng. Manag. 39, 176–188 (1992). https://doi.org/10.1109/17.141275
Cited by
16 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献