Author:
Tang Qiuhua,Li Jie,Floudas Christodoulos A.,Deng Mingxing,Yan Yunbing,Xi Zhongmin,Chen Pinghe,Kong Jianyi
Publisher
Springer Science and Business Media LLC
Reference42 articles.
1. Feldmann K., Rottbauer H., Roth N.: Relevance of assembly in global manufacturing. Ann. CIRP 45, 545–552 (1996)
2. Larkin J.: The 1,000,000th vehicle produced at BMW manufacturing Co. in spartanburg automotive industries. Automot. Ind. 186, 55 (2006)
3. Rungtusanatham M.J., Salvador F.: From mass production to mass customization: Hindrance factors, structural inertia, and transition hazard. Prod. Oper. Manage. 17, 385–396 (2008)
4. Fournier X., Agard B.: Improvement of earliness and lateness by postponement on an automotive production line. Int. J. Flexible Manuf. Syst. 19, 107–121 (2007)
5. Hazbany, S., Gilad, I., Shpitalni, M.: About the efficiency and cost reduction of parallel mixed-model assembly lines. The 17th CIRP Design Conference, Berlin, Germany, March 27–28 (2007)
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献