1. API 2INT-MET. (2007). Interim Guidance on Hurricane Conditions in the Gulf of Mexico. API Recommended Practice, 2INT-MET(1), 54.
2. API RP 2A-WSD. (2014). API RP 2a WSD-22nd-Edition-2c-November-2014 - Recommended practice for planning, designing and constructing fixed offshore platforms - WSD. In API Recommended Practice (Issue December 2000, p. 324). www.api.org.
3. API RP 2SK. (2005). Design and analysis of stationkeeping systems for floating structures, Third Edition, October 2005.
4. Chandrasekaran, S., Hari, M., & Ramachandra, V. (2019). Numerical Analysis on Triceratops Restraining System : Failure Conditions of Tethers., 13(9), 588–592.
5. Chandrasekaran, S., & Kiran, P. A. (2018). Mathieu stability of offshore triceratops under postulated failure. Ships and Offshore Structures, 13(2), 143–148. https://doi.org/10.1080/17445302.2017.1335578