1. Xinhua News Agency (2013) CPC central committee on some major issues concerning comprehensively deepening the reform. Practice: Party Education Edition 34(12):7–18
2. Liu M, Liu C, Xing L, Liu Z, Li X, Lin L (2016) Assembly process control method for remanufactured parts with variable quality grades. Int J Adv Manuf Technol 85(5):1471–1481
3. Liu C (2016) Tolerance redistributing of the reassembly dimensional chain on measure of uncertainty. Entropy 18(10):348
4. Haapala K R,Khadke K N,Sutherland J W 2004. Predicting manufacturing waste and energy for sustainable product development via WE-fab software.Berlin,Germany:Uni-Edition:243–250
5. Zhang Q, Jia GY, Cai JJ, Shen FM (2013a) Carbon flow analysis and CO2 emission reduction strategies of iron-making system in steel enterprise. Journal of Northeastern University (Natural Science) 34(3):392–394