Publisher
Springer Science and Business Media LLC
Subject
Industrial and Manufacturing Engineering,Computer Science Applications,Mechanical Engineering,Software,Control and Systems Engineering
Reference29 articles.
1. Zamani R (2010) A parallel complete anytime procedure for project scheduling under multiple resource constraints. Int J Adv Manuf Technol 44(3):1–10
2. Elmaghraby SE (1977) Activity networks: project planning and control by network models. Wiley, New York
3. Sabzehparvar M, Seyed-Hosseini S (2008) A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags. J Supercomput 44(3):257–273
4. Wang J (2004) A fuzzy robust scheduling approach for product development projects. Eur J Oper Res 152(1):180–194
5. Moder JJ, Phillips CR, Davis EW (1983) Project management with CPM, PERT, and precedence diagramming. Van Nostrand Reinhold, New York
Cited by
15 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献