1. Amini MM, Donna R-R, Bienstock CC (2005) Designing a reverse logistics operation for short cycle time repair services. Int J Prod Econ 96(3):367–380
2. Baines TS, Lightfoot HW, Evans S, Neely A, Greenough R, Peppard J, Roy R, Shehab E, Braganza A, Tiwari A, Alcock JR, Angus JP, Bastl M, Cousens A, Irving P, Johnson M, Kingston J, Lockett H, Martinez V, Michele P, Tranfield D, Walton IM, Wilson H (2007) State-of-the-art in product-service systems. Proc Inst Mech Eng B J Eng Manuf V221:10
3. Brezet H (2000) Product-service substitution: examples and cases from the Netherlands, ''Funktionsförsäljning''-product-service systems, Stockholm, Swedish EPA, AFR-report 299
4. Dar-El EM, Wysk RA (1982) Job shop scheduling—a systematic approach. J Manuf Syst 1:77–88
5. Fink A, Reiners T (2006) Modeling and solving the short-term car rental logistics problem. Transp Res Part E Logist Trans Rev 42(4):272–292