1. Baliga B, Nahavandi S, Kong LX (2000) Cycle time reduction in high pressure die casting. Proc PCM2000, Detroit, USA; 500–505
2. Masood SH, Jeyasingh VS (2007) Process time reduction in blow moulding process with conformal cooling. Proc ANTEC 2007, Cincinnati, Ohio; 918–922
3. Zhipeng XSG, Hyun CS, Kil CJ (2007) Interfacial heat transfer coefficient between metal and die during high pressure die casting process of aluminum alloy. Front Mech Eng China (2/3):283–287
4. Zhipeng XSG, Liu BC, Li M, Allison J (2008) Effect of process parameters, casting thickness and alloys on the interfacial heat transfer coefficient in the high pressure die casting process. Metal Mat Trans A (39/12):2896–2905
5. Lau F, Lee WB, Xiong SM (1998) A study of the interfacial heat transfer between an iron casting and a metallic mould. J Mater Process Tech 79:25–29