Author:
Lou Ping,Liu Quan,Zhou Zude,Wang Huaiqing,Sun Sherry Xiaoyun
Publisher
Springer Science and Business Media LLC
Subject
Industrial and Manufacturing Engineering,Computer Science Applications,Mechanical Engineering,Software,Control and Systems Engineering
Reference42 articles.
1. Pinedo M (1995) Scheduling: theory, algorithms and systems. Prentice-Hall, Englewood Cliffs
2. Hall NG, Potts CN (2004) Rescheduling for new orders. Oper Res 52(3):440–453
3. Cowling PI, Johanson M (2000) Multi-agent systems for dynamic scheduling. In: Proceedings of the 19th workshop of the UK, Plansig, 14–15th December 2000, pp 45–54.
4. Vieira G, Herrmann J, Lin E (2003) Rescheduling manufacturing systems: a framework of strategies, policies and methods. Journal of Scheduling 6:39–62
5. Herroelen W, Leus R (2005) Project scheduling under uncertainty: survey and research potential. Eur J Oper Res 165(2):289–306
Cited by
57 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献