1. Tohidi H (2012) Six sigma methodology and its relationship with lean manufacturing system. Adv Environ Biol 6:895–906
2. Webster M, Sudgen D (2003) Implementation of virtual manufacturing by a technology licensing Company. Int J Oper Prod Manag 23:448469
3. Ohno T (1988) Toyota production system: beyond large-scale production. Productivity Press, New York
4. Womack JP, Jones DT, Roos D (1990) The machine that changed the world. Rawson Associates, New York
5. Vinodh S, Aravindraj S (2012) Axiomatic modeling of lean manufacturing system. J Eng Des Technol 10:199216