Author:
Manríquez Fabián,González Héctor,Morales Nelson
Publisher
Springer Science and Business Media LLC
Subject
Electrical and Electronic Engineering,Control and Optimization,Mechanical Engineering,Aerospace Engineering,Civil and Structural Engineering,Software
Reference44 articles.
1. Akaike A, Dagdelen K (1999) A strategic production scheduling method for an open pit mine. Proceedings of the 28th application of computers and operation research in the mineral industry pp 729–738
2. Alexandre RF, Campelo F, Vasconcelos JA (2019) Multi-objective evolutionary algorithms for the truck dispatch problem in open-pit mining operations. Learn Nonlinear Models 17(2):53–66. https://doi.org/10.21528/lnlm-vol17-no2-art5
3. Asad MW (2005) Cutoff grade optimization algorithm with stockpiling option for open pit mining operations of two economic minerals. Int J Surf Min Reclam Environ 19(3):176–187. https://doi.org/10.1080/13895260500258661
4. Benlaajili S, Moutaouakkil F, Chebak A, Medromi H, Deshayes L, Mourad S (2020) Optimization of truck-shovel allocation problem in open-pit mines. communications in computer and information science 1207 CCIS:243–255, https://doi.org/10.1007/978-3-030-45183-7_19
5. Bley A, Boland N, Froyland G, Zuckerberg M (2009) Solving mixed integer nonlinear programming problems for mine production planning with a single stockpile. In: Technical Report 2009/21, Institute of Mathematics, TU Berlin
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献