1. Albor F, Dimitrakopoulos D (2010) Algorithmic approach to pushback design based on stochastic programming: method, application and comparisons. Min Technol 199:88–101
2. Alford C (1995) Optimisation in underground mine design. In: Proceedings of the application of computers and operations research in the mineral industry (APCOM) XXV, Brisbane, pp 213–218
3. Bakhtavar E, Shahriar K, Oraee K (2008) A model for determining the optimal transition depth over from open pit to underground mining. In: Proceedings of the 5th international conference and exhibition on mass mining, Luleå, pp 393–400
4. Bootsma MT, Alford C, Benndorf J, Buxton MWN (2014) Cut-off grade-based sublevel stope mine optimisation—introduction and evaluation of an optimisation approach and method for grade risk quantification. In: Proceedings of the orebody modelling and strategic mine planning, AusIMM, Perth, pp 281–290
5. Carpentier S, Gamache M, Dimitrakopoulos R (2016) Underground long-term mine production scheduling with integrated geological risk management. Min Technol 125(2):93–102