1. Agre, J., Elsley, G., McFarlane, D., Cheng, J., and Gunn, B., 1994, Holonic Control Of Cooling Control System, Proceedings Of Rensslaers Manufacturing Conference (New York).
2. Baker, A., 1998, A Survey Of Factory Control Algorithms Which Can Be Implemented In A Multi-Agent Heterarchy: Dispatching, Scheduling, And Pull. Journal of Manufacturing Systems, 17, (4), 297–320.
3. Bengoa, A., 1996, An Approach To Holonic Components In Control Of Machine Tools. Annals of CIRP, 45, (1).
4. Biswas, G., Sugato, B., And Saad, A., 1995, Holonic Planning And Scheduling For Assembly Tasks, Internal Report CIS-95–01, Centre For Intelligent Systems, Vanderbilt University, Nashville, TN.
5. Bongaerts, L., Monostori, L., McFarlane, D., And Kadar, B., 1998a, Hierarchy in Distributed Shop-Floor Control, Proceedings of IMS’98–ESPRIT Workshop in Intelligent Manufacturing Systems ( Lausanne, Switzerland).