Author:
Tackenberg Sven,Duckwitz Sönke,Schmalz Christina,Schlick Christopher Marc
Publisher
Springer Berlin Heidelberg
Reference43 articles.
1. Alvarez-Valdes R, Tararit JM (1989) Heuristic algorithms for resource constrained project scheduling: a review and an empiricial analysis. In: Słowiński R, Węglarz J (eds) Advances in project scheduling. Elsevier, Amsterdam, pp 113–134
2. Artigues C, Demassey S, Néron E (2008) Resource-constrained project scheduling. Models, algorithms, extensions and applications. Wiley, Hoboken, NJ
3. Bartusch M, Möhring R, Radermacher FJ (1988) Scheduling project networks with resource constraints and time windows. Ann Oper Res 16(1):201–240
4. Belhe U, Kusiak A (1995) Resource constrained scheduling of hierarchically structured design activity networks. IEEE Trans Eng Manag 42(2):150ff
5. Bellenguez-Morineau O, Néron E (2008) Multi-mode and multi-skill project scheduling problem. In: Artigues C, Demassey S, Néron E (eds) Resource-constrained project scheduling. Models, algorithms, extensions and applications. Wiley, Hoboken, NJ, pp 149–160
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献