1. Akartnnali, K., und A. J. Miller (2009). A henristic approach for big bucket multi-level production palnning problems.
European Journal
0/
Operational Research
193, 396–411.
2. Ahnada-Lobo, B., M. A. Carravilla und J. F. Oliveira (2008). A note on "The capacitated lotsizing and scheduling problem with sequence-dependent setup costs and setup times' '. Computers & Operntions Research 95(4), 1374–1376.
3. Ahneder, C. (2010). A Hybrid Optimization Approach for Multi-Level Capacitated LotSizmg Problems. European Journal of Opemtional Research 200, 59!Hi06.
4. Ahneder, C., D. Klabjan, R. Traxler und B. Ahnada-Lobo (2015). Lead Time Considerations far the Multi-Level Capacitated Lot-sizing Problem.
European Journal
0/
Operational
Research 241, 727–738.
5. Barbarosoglu, G., und L. Özdamar (2000, August). Analysis of solution space-dependent performance of simulated annealing: the case of the multi-level capacitated lot sizing problem. Computers & Qpemtions Research 27(9), 895–903.