Author:
Wolff Julius,Kolditz Torge,Günther Lutz,Raatz Annika
Publisher
Springer Berlin Heidelberg
Reference9 articles.
1. [1] Duflou, JR; Seliger, G; Kara, S; Umeda, Y; Ometto, A; Willems, B (2008) Efficiency and feasibility of product disassembly: A case-based study. CIRP Annals – Manufacturing Technology 57(2): 583-600
2. [2] Seliger; G (2007) Sustainability in Manufacturing – Recovery of Resources in Product and Material Cycles. Berlin, Springer Berlin Heidelberg New York
3. [3] Hesselbach, J., Hermann, C., Luger, T. (2007) Sustainability in Manufacturing – 3.4 Assessment of Recyclability. Berlin, Springer Berlin Heidelberg New York
4. [3] Gungor, A; Gupta, SM (1998) Disassembly sequence planning for products with defective parts in product recovery. Computers & Industrial Engineering 35(1-2): 161-164
5. [4] Seliger, G; Keil, T; Rebafka, U; Stenzel, A (2001) Flexible Disassembly Tools. Proceedings of the 2001 IEEE International Symposium on Electronics and the Environment 30-35