Publisher
Springer Science and Business Media LLC
Subject
Information Systems,Control and Systems Engineering
Reference33 articles.
1. Brown S M, Hanschke T, Meents I, Wheeler B R, Zisgen H (2010). Queueing model improves IBM’s semiconductor capacity and lead-time management. INFORMS Journal on Applied Analytics 40(5): 397–407.
2. Burton G (2017). TSMC says 3nm plant could cost it more than $20bn. https://web.archive.org/web/20171012043608/https://www.theinquirer.net/inquirer/news/3018890/tsmc-says-3nm-plant-could-cost-it-more-than-usd20bn, accessed on May 23, 2022.
3. Cassandras C G, Lafortune S (2008). Introduction to Discrete Event Systems(2ed). Springer, New York.
4. Çatay B, Erengüç Ş S, Vakharia A J (2003). Tool capacity planning in semiconductor manufacturing. Computers & Operations Research 30(9): 1349–1366.
5. Chen T (2012). Intelligent scheduling approaches for a wafer fabrication factory. Journal of Intelligent Manufacturing 23(3): 897–911.