1. Loring, D.M.& Nelson, B.V. (2006). Transition of the Henderson Mine ventilation system to the new lower levels. 11th U.S./North American Mine Ventilation Symposium. Pennsylvania, USA.
2. Loring, D.M. & Gillon, J. (2012). Design and Construction of the 3,700 Kw (5,000 HP) No. 5 Shaft Main Exhaust Fans at Henderson Mine. Society of Mining, Metallurgy & Exploration, USA.
3. Nelson, B. V. & Harney, D.C (1995). Remote Control and Monitoring of Ventilation at the Henderson Mine. Society of Mining Engineers 1995 Annual Meeting Preprint Denver USA
4. Brokering, R.D., Loring, D.M. & Rutter, C.J. (2017). Practical Implementation of VOD at the Henderson Mine. Proceedings of the 16th North American Mine Ventilation Symposium. Colo-rado, USA.
5. Gyamfi, S., Halim, A., & Martikainen, A. (2021). Development of Strategies to Reduce Ventilation and Heating Costs in a Sweedish Sublevel Caving Mine-a Unique Case of LKAB’s Konsuln Mine. Mining, Metallurgy & Exploration, USA.