Author:
Pathak Pranjal,Samanta Biswajit
Publisher
Springer Science and Business Media LLC
Subject
Materials Chemistry,Metals and Alloys,Mechanical Engineering,Geotechnical Engineering and Engineering Geology,General Chemistry,Control and Systems Engineering
Reference27 articles.
1. Bakhtavar E, Oraee K (2012) A short-term production planning model for dimension stone quarries. In: SME Annual meeting. Society for Mining, Metallurgy & Exploration, pp 241–243
2. Blom M, Pearce AR, Stuckey PJ (2019) Short-term planning for open pit mines: a review. International Journal of Mining Reclamation and Environment 33(5):318–339
3. Blom ML, Burt CN, Pearce AR, Stuckey PJ (2014) A decomposition-based heuristic for collaborative scheduling in a network of open-pit mines. INFORMS J. Comput. 26(4):658–676
4. Blom ML, Pearce AR, Stuckey PJ (2016) A decomposition-based algorithm for the scheduling of open-pit networks over multiple time periods. Manag. Sci. 62(10):3059–3084
5. Both C, Dimitrakopoulos R (2020) Joint stochastic short-term production scheduling and fleet management optimization for mining complexes. Optim. Eng., pp 1–27