Funder
Agencia Nacional de Investigación y Desarrollo
Publisher
Springer Science and Business Media LLC
Subject
Materials Chemistry,Metals and Alloys,Mechanical Engineering,Geotechnical Engineering and Engineering Geology,General Chemistry,Control and Systems Engineering
Reference21 articles.
1. Sinclair L, Thompson J (2015) In situ leaching of copper: challenges and future prospects. Hydrometallurgy 157:306–324. https://doi.org/10.1016/j.hydromet.2015.08.022
2. Seredkin M, Zabolotsky A, Jeffress G (2016) In situ recovery, an alternative to conventional methods of mining: exploration, resource estimation, environmental issues, project evaluation and economics. Ore Geol Rev 79:500–515. https://doi.org/10.1016/j.oregeorev.2016.06.016
3. Märten H (2019) Trends in IRS Technology. Proceedings of the ALTA 2019 conference, 18–25 May 2019, Perth, Australia.
4. Batterham RJ, Robinson DJ (2019) Will in-place recovery ever replace the need for flotation? Min Metall Explor 36:189–197. https://doi.org/10.1007/s42461-018-0030-x
5. BIOMore (2018) D7.1: Economic evaluation of coupled chemical-biochemical underground block leaching scenarios. BIOMOre project , New Mining Concept for Extracting Metals
from Deep Ore Deposits using Biotechnology, KGHM Polska Miedz SA, Lubin, Poland. BIOMOre: An Alternative Mining Concept Project, Technical Report. https://www.biomore.info/project/public-deliverables/. Accessed July 2019