1. Mark C (1990) Pillar design methods for longwall mining. United States Bureau of Mines Information Circular 9247
2. Colwell MG (1998) Chain pillar design - calibration of ALPS. Australian Coal Association Research Program, final report—ACARP project C6036
3. Mark C, Chase FE, Molinda GM (1994) Design of Longwall gate entry systems using roof classification. In: Proceedings of the United States Bureau of Mines Technology Transfer Seminar - New Technology for Longwall Ground Control. USBM Special Publication 01–94, pp 5 – 17
4. Ghosh N, Agrawal H, Singh SK, Banerjee G (2020) Optimum chain pillar design at the deepest multi-seam longwall workings in India. Mining, Metallurgy & Exploration 37:651–664
5. Seedsman R, Jalalifar H, Aziz N (2005) Chain pillar design – can we? In: Proceedings of the coal 2005: coal operator’s conference. University of Wollongong, Brisbane, pp 59–62