1. GFMS Ltd (2010),Gold Survey 2010, London (www.gfms. co.uk)
2. Hagelüken, C., C.E.M. Meskers, (2008). “Mining our computers — Opportunities and challenges to recover scarce and valuable metals”, in: Proceedings of Electronics Goes Green Conference 2008, H. Reichl, N. Nissen, J. Müller, O. Deubzer (eds.), Fraunhhofer IRB, Stuttgart, 585–590
3. Vanbellen, F., M. Chintinne (2008), “Extreme Makeover” — UPMR’s Hoboken plant”, World of Metallurgy —Erzmetall, Vol. 61, No. 1 2008, 14–19
4. Chancerel, P., C.E.M. Meskers, C. Hagelüken, V.S. Rotter, (2009), “Assessment of Precious Metal Flows During Preprocessing of Waste Electrical and Electronic Equipment”,J. Indus. Ecol., vol.13 (5), 791–810
5. Sander, K., S. Schilling, (2010), “Transboundary shipment of waste electrical/electronic equipment/electronic scrap — optimization of material flows and control”, Federal Environment Agency Report No. (UBA-FB) 1331, Dessau. Germany