Publisher
Springer Science and Business Media LLC
Reference52 articles.
1. Plossl, G.W., Orlicky, J.: Orlicky’s material requirements planning. McGraw-Hill (1994). https://doi.org/10.5555/561905
2. Rota, K., Thierry, C., Bel, G.: Capacity-constrained MRP system: a mathematical programming model integrating firm orders, forecasts and suppliers. Universite Toulouse II Le Mirail, Departament d’Automatique (1997)
3. Billington, P.J., McClain, J.O., Thomas, L.J.: Mathematical programming approaches to capacity-constrained MRP systems: review, formulation and problem reduction. Manage. Sci. 29(10), 1126–1141 (1983). https://doi.org/10.1287/mnsc.29.10.1126
4. Stadtler, H.: Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing. Eur. J. Oper. Res. 94(3), 561–581 (1996). https://doi.org/10.1016/0377-2217(95)00094-1
5. Clark, A.R.: Optimization approximations for capacity constrained material requirements planning. Int. J. Prod. Econ. 84(2), 115–131 (2003). https://doi.org/10.1016/S0925-5273(02)00400-0